Our Company Services Projects FAQ Contact
Construction Advisory

Construction Advisory: Claims, Risk & Project Recovery

Constructability reviews, risk management, and claims support for contractors who need a second, senior set of eyes before a dispute or delay becomes expensive.

Early detectionof constructability risk
Defensible recordsfor claims & disputes
Recovery playbooksfor delayed projects
Independent reviewprincipal-led, no junior hand-offs

A second set of senior eyes, before problems get expensive

Constructability issues and weak claims records are cheapest to fix before they turn into disputes.

Construction advisory covers the judgment calls that sit above day-to-day project controls: whether a design is actually buildable as planned, whether your records would hold up in a claim, and what a realistic recovery path looks like once a project has slipped. For contractors in Alberta and across Canada, this is usually brought in at two points — before a complex project starts, or after one has already gone sideways.

Focus NexGen delivers this advisory work personally, not through a junior reviewer. Founder Abid Hussain, PMP, PMI-RMP, brings 23+ years across EPC, infrastructure, and energy project delivery in the GCC and Canada, with direct experience in constructability reviews, claims documentation, and recovering projects that were already behind.

What's included

From a single constructability or claims review to full project recovery support.

Constructability reviews

Design and sequencing reviewed before mobilization, catching interface conflicts and sequencing risk while changes are still cheap.

Claims & change management

Notices, contemporaneous records, and delay/disruption windows analyses built to protect entitlement, not reconstructed after the fact.

Risk management

Risk registers and mitigation plans that get used on site, tied to the schedule and cost baseline, not a document that sits in a folder.

Project recovery

Baseline rebuild, realistic forecasting, and a sequenced recovery plan for projects that have already fallen behind.

Who it's for

Contractors and owners in Alberta or across Canada facing a complex build, a project that has already slipped, or a potential claim where the records need to be put in order before positions harden. Also useful as an independent pre-mobilization check on design and sequencing.

How engagements start

Week 0–1 • Assessment

Document review, current status snapshot, constructability or claims exposure check.

Week 1–2 • Findings & plan

Clear findings report with prioritized risks and a recommended path — recovery, claim, or mitigation.

Ongoing • Support

Hands-on support through execution of the recovery plan or claim, as long as it's needed.

Frequently asked questions

  • No — the highest-value work is usually before mobilization, reviewing constructability and setting up proper records so a dispute is less likely in the first place.

  • Yes. An independent advisory review alongside your existing project team is a common engagement shape — it doesn't require replacing anyone.

  • A clear findings report: what's defensible in your current records, what's missing, and a prioritized plan to close the gaps before positions on either side harden.

  • No — it's scoped for small and mid-sized contractors specifically, where a full in-house claims or constructability function usually isn't justified.

Related services

Project Controls Consulting

Scheduling, cost control, EVM, and risk management for active projects.

O&M Consulting

Operations & maintenance planning and reliability for energy and industrial facilities.