O&M that starts before the ribbon-cutting
Operations & maintenance consulting covers the systems that keep a facility running once construction ends: preventive maintenance programs, spare parts and criticality planning, maintenance organization structure, and the documentation that makes a plant auditable. For energy and industrial facilities across Alberta and the GCC, a clean O&M setup is the difference between planned maintenance and constant firefighting.
Focus NexGen builds O&M readiness the way a facility will actually operate it — grounded in field experience, not a generic template. Founder Abid Hussain, PMP, has led plant maintenance and planning directly, including heading Plant Maintenance and Planning at an early production facility, alongside 23+ years across EPC and operations work in the GCC and Canada.
What's included
Preventive maintenance programs
PM schedules built around manufacturer recommendations and actual criticality, not a one-size-fits-all interval list.
Spare parts & criticality planning
Criticality analysis that tells you which spares genuinely need to be on the shelf, and which are just tying up capital.
Maintenance organization & workflow
Clear roles, work-order flow, and reporting lines so maintenance requests don't disappear into email threads.
O&M documentation & audit readiness
Maintenance records, SOPs, and handover documentation structured to pass client, lender, or regulatory audits.
Owners and operators of energy, industrial, or infrastructure facilities in Alberta or the GCC approaching construction handover, or already operating without a structured maintenance program. Also useful for facilities inheriting poor O&M documentation from a previous operator or contractor.
How engagements start
Week 0–1 • Readiness review
Asset register check, current maintenance practice audit, criticality snapshot.
Week 2–4 • Program build
PM schedules, spare parts planning, workflow and documentation structure.
Week 5+ • Handover & coaching
Training the operating team, embedding the cadence so it runs without us.
Frequently asked questions
Yes — most engagements involve tightening up an existing maintenance program, not starting from a blank asset register.
That's the ideal timing. Starting O&M planning during late construction means the facility is ready to run reliably from handover, instead of improvising in the first few months.
The core engagement builds and hands over the program with your team trained on it. Ongoing advisory support is available separately if you want a periodic external check.
Yes — O&M consulting is offered across both Alberta/Canada and the GCC, drawing on direct operations experience in both regions.
Related services
Project Controls Consulting
Scheduling, cost control, EVM, and risk management for active projects.